View Single Post
  #31  
Old 07-29-2011, 06:57 PM
IPB-Autosport's Avatar
IPB-Autosport IPB-Autosport is offline
PCA Member (Vendor Rep.)
 
Join Date: May 2011
Posts: 18
Downloads: 0
Uploads: 0
Default Re: IPB-Autosport 996 GT3 4 Liter

Case cleaned and ready to go. Main and intermediate shaft bearings go in, followed by the crankshaft assembly.

Click the image to open in full size.

Crank is in. Porsche coat hanger special tool supports the new timing chains. Oil pump is also in.

Click the image to open in full size.
Click the image to open in full size.

Tensioning the oil pump nuts.

Click the image to open in full size.

Time to glue the case.

Click the image to open in full size.

Cleanliness is the key to getting a perfect seal.

Click the image to open in full size.
Click the image to open in full size.

Spread it with a brush.

Click the image to open in full size.

Other case half is on.

Click the image to open in full size.

Special tools are required to properly seat the through-bolt seals.

Click the image to open in full size.

The through bolts are tensioned.

Click the image to open in full size.

Then the nuts around the case perimeter.

Click the image to open in full size.

The case is now put together. Next step… pistons.
__________________

Reply With Quote